State: MADHYA PRADESH District: DHAR Block: NALCHHA Panchayat: Silotiya
Work Code: 1722005027/RC/22012034317581 (silotiya adivasipura se khatipura tak silotiya)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 2/10/2016 Work start date : 9/12/2016
Present status : Gravel Road Proposed Status : Construction of Gravel Road Roads for Community
Tech Sanction Details
Technical Sanction No. : 223(16-17) Sanction Date : 20/11/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
698000 602000 0 0 0 0 0 602000 0 1300000
Financial Sanction Details
Financial\Administrative Sanction No: 141(16-17) Financial\Administrative Sanction Date 22/11/2016
Fin. Sanc. Amt. (in Rs) NREGA:1300000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1300000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard110001000
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.132503250
3Filling foundation and around masonry work with moorum I/c ramming layers and watering.158.323.763761.208
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)4.83217.115442.08
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)47.42484.4117760.56
6False work for R.C.C. and P.C.C. work in plinth and foundation91.08144.613170.168
7Levelling - Headwork.-Below 5 m interval10159015900
8Levelling - Headwork.-5 to 10 m interval1508.8508.8
9Transportation of metal 2500120.96302400
10Transportation of metal 600120.9672576
11Transportation rates for Lime (fat), Hydraulic or any other.122903480
12Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia25.9746.519334.35
13Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.123140.837689.6
14Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making123018.422632
15Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor279024.768913
16Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work1837.588.4162435
17Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil13.7696.21323.712
18Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Hard moorum20.64117.82431.392
19Lossening of hard soil by ploughing the existing gound27902775330
20Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed279050139500
21Collection/Excavation of Gravel Material meeting the requirements of Hard moorum as detailed in RES SOR chapter No. 03 Notes Clause 3.2(C) including stacking and all leads and lifts up to the loading point at quarry.380152.557950
22Collection of river Borne material (RBM)(any mixture of sand & gravel)i/c boxing and all leads and lifts up to the loading point at quarry.240135.432496
23Spreading of material mixing by mix in place method by manual means or by tractor mount disk harrows to meet the requirements of Grading and Plasticity given in clause 2.2.2.2,2.2.2.3,2.2.3.1 and 2.2.3.2 of IRC SP: 77-2008 and grading by tractor mount.60012072000
24Rolling & Compaction of granule sub-base of well graded-material Spreading in unformed layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC and compacting with Smooth wheel rollers of 80 to 100 KN static weight to achieve the desired density, complete as pet Technical Specification Clause 401 of Specification for Rural Roads i/c all leads of water etc, complete.6006337800
25Setting out work (Reference pillars referencing bench mark and temporary bench mark):Painting/Marking of Reference/Working Bench Mark over existing permanent structure Fixing of Reference pegs made of local rough wood for making centre line and toe lines. Fixing of reference poles made of bamboos or jungle wood bellies etc.12012020120
Total Activity 1300000
S.NoMaterialQuantityUnit PriceTotal
11904 transportion rcc hump pip122803360
220 MM Graded Metal42.6670029862
3BGSY SIGN BOARD (600X600MM)159335933
4Cement18730056100
5Centering and Shuttering91.08706375.6
6Compaction6006337800
7Compaction of Selected soil123018.422632
8compaction of sub grad earthen279024.768913
9contigency11000010000
10FTSC-Field Technical supervisi110001000
11hume pipe123140.837689.6
12hume pipe np3-600mm25.8746.519259.7
13Transportanion of hard Muram812790225990
14Transportation of GSB9260055200
15रेत21.752100021752
Total Material 602000