State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: CHICHGOHAN
Work Code: 1725006018/WC/22012034549321 (चेकडैम निर्माण कार्य राजेश हुकूमचंद के खेत पास)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/4/2020 Work start date : 20/4/2020
Present status : Existing Proposed Status : Constr of Brushwood Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 1725006/2020-2021/111295/TS Sanction Date : 14/5/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
278081.02 955199.32 11305.14 31495.91 0 0 0 998000 0 1276081.39
Financial Sanction Details
Financial\Administrative Sanction No: 1725006/2020-2021/111295/AS Financial\Administrative Sanction Date 14/5/2020
Fin. Sanc. Amt. (in Rs) NREGA:1276370 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1277000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(b) C.C. 1:3:6 (1cement, 3sand, 6metal)276.463159.36869709904873439.07
2Plum cement concrete 1:3:6 with 75% graded metal of 40mm size and 25% plums of 150mm size.57.62313.87256944444133279.06
3Centering and shuttering including strutting , propping etc. and removal of form work for P.C.C. work in foundation, footing, bases for column435.83156.78103847830668329.88
4(j) 5.0 Km. Lead303.74174.08349246065752876.12
5(X) 5.0 Km. Lead145.56152.11280571585622141.54
6Site clearance, cutting grass, raking into heaps and removing off the premises4302.625465116279071128.95
7b (iii) Dense or hard soil for Tank Work40.5134.1874074074075434.59
8c (iii) Hard moorum for Tank Work82.14178.73776479181914681.52
9a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work178.92567.18315448245101480.41
10Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13578.363578.36
Total Activity 1277000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper34.13688530210.36
20084-Hire charges of Diesel truck - 9 tonne (without POL)16.7466224237545.8772
30367-Portland Cement68.19415511375817.6851
40368-White cement 0.0004157446.2976
50983-Fine sand (zone IV)145.39121076.25156477.279
61235-Diesel oil194.09326813198.3376
75001-Mobil oil6.8661182.91255.80969
87900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
9MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT222.964525117056.1
10MR6002-Shingles, Graval, Pabbles, Plums 150mm nominal size (Rate@Quarry)14.4157.472267.568
11MR6032-Snowcem/ durocem0.00072778919.4523
12MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)66.374468245267.3408
13MR6091-WOOD-Kail wood 2nd class1.556515825.624632.5464
Total Material 805000