Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 07:09:15 PM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: BAROKHAR
Work Code: 1713004020/RC/22012034199151 (GSB सडक बसिगवां मोड से बडोखर पहुच मार्ग -1 Ts n 16)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2013 Work start date : 16/1/2014
Present status : Earthern road Proposed Status : Bitumen Top
Tech Sanction Details
Technical Sanction No. : 1610/20/ Sanction Date : 10/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Beneficiary Contribution MMGSY scheme3 Total
798000 528000 0 0 0 147000 0 675000 0 1473000
Financial Sanction Details
Financial\Administrative Sanction No: 22/020/ Financial\Administrative Sanction Date 12/1/2014
Fin. Sanc. Amt. (in Rs) NREGA:1473000 Beneficiary Contribution
0
MMGSY
0
Scheme 3
0
Total
1473000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises69001.611040
2Dag-beling-Single spade stroke minimum 75mm deep22500.2450
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)5.4972343.812883.8686
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2.5:5 (1cement, 2.5 sand, 5metal)28.6063007.586032.545
5False work for R.C.C. and P.C.C. work in plinth and foundation82.506126.210412.2572
6Transportation of metal 2989.575102.69306999.45675
7Transportation of metal 710.7223.56158884.092
8Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia22.5309.46961.5
9Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia.7.53868.129010.75
10Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1993.0521.542850.575
11Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor1993.052345840.15
12Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)710.739.628143.72
13Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:115.88578.367013.404
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work996.52581.280917.83
15Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti32.10497.63133.3504
16Collection of puddle earth including stacking at quarry3236.775112.8365108.22
17Collection of hard moorum including stacking at quarry.463.5130.860625.8
18Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete (i) 5th Kilometre Stone (precast) (ii) Ordinary Kilometer Stone (Precast) (iii) 200 m stone (precast)614698814
19SIGN BOARD11091510915
20DAG BELING2.53348.2880.946
21contingency14800048000
22Labour difference in case of old SoR60014687600
Total Activity 1473000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work1993.0516.833483.24
2Compaction of GSB115.88391.4845364.7024
3Compaction of Selected soil1993.0519.839462.39
4contangency and work charges14400044000
5Convergence Amount1147000147000
6Display board11091510915
7HumePipes12500025000
8soil transportation2989.5763.27189150.0939
9Tran. water lead1993.0510.520927.025
10Transportation charges13341933419
11transportation of hard muram 1463.5184.1485348.89
Total Material 675000