State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: MALUD
Work Code: 1725001028/RC/22012034287533 (SUDOOR KHET JALLAD HARNETH KHETH SE KHNIYA SAHU KE KHET KI OUR)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2015 Work start date : 25/10/2015
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 00985/2015 Sanction Date : 15/10/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
428637 331287 0 0 0 0 0 332000 0 759924
Financial Sanction Details
Financial\Administrative Sanction No: 0015/2015 Financial\Administrative Sanction Date 25/10/2015
Fin. Sanc. Amt. (in Rs) NREGA:759000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
759000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.41254.418150
2Mud Mortar1233.1233.1
3Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Hard rock requiring blasting4373.51494
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead100095.695600
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)103177.831778
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)12287834536
7Pointing on brick work with lime mortar 1:2 (1lime putty, 2sand)-Flush pointing000
8Chain and compass survey.-Canals/Roads1584584
9Fly levelling for fixing temporary bench marks.-Upto 15 m interval1954954
10Levelling - Headwork.-Below 5 m interval115901590
11Levelling - Headwork.-5 to 10 m interval112721272
12Collection of quarried stone or rubble.-Size 0.014 cum to 0.06250150.437600
13Stacking without boxing.-Puddle earth, moorum, sand or kankar1197.811.513774.7
14Transportation rates for Masonry stone.70013896600
15Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal, grade-1 As per MOST 2004 clause 400.2.5 including dressing.35097.434090
16Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7250107.726925
17Rolling and consolidating water bound mecadam coat with any size of metal of any thickness upto 100mm thickness(including rolling screening or binding materials) including watering & filling in depressions which occur during the process with power roller-Excluding hire and running expenses of roller25011.72925
18Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia.6318519110
19Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making100035.135100
20Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor20003570000
21Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work14.288.41255.28
22Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work150088.4132600
23Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work865.82117.7101907.014
Total Activity 759000
S.NoMaterialQuantityUnit PriceTotal
11904 tranportion of rcc hum pi2871287
240 MM Metal Transportation2060012000
3BAJARA1500500
4Cement18031055800
5Centering and Shuttering601006000
6Compaction of Earth Work29123129123
7Display board120002000
8Gravel or moorum18004377400
9hume pipe5.5318517517.5
10Kilometre Stone (200 M)53501750
11roller 8 to 1040058.123240
12Rolling Earth & moorum150032.749050
13Sand for filling and road blin87506000
14Transportanion of hard Muram501376850
15Transportanion of Soft Muram110.16220.9124335.4456
16water tanker4050020000
Total Material 332000