Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 07:38:00 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: RAJGARH-1
Work Code: 1725007060/RC/11 (ग्रेवल रोड निमार्ण ग्राम से लखन ठाकुर के खेत तरफ/ )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2009-2010 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2009 Work start date : 16/2/2010
Present status : No Road Proposed Status : Earthern road
Tech Sanction Details
Technical Sanction No. : 797W Sanction Date : 16/2/2010
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
318000 175000 0 0 0 0 0 175000 0 493000
Financial Sanction Details
Financial\Administrative Sanction No: 13WA Financial\Administrative Sanction Date 20/2/2010
Fin. Sanc. Amt. (in Rs) NREGA:493000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
493000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.80002.5420320
2Dag-beling-Single spade stroke minimum 75mm deep30000.29870
3Collection of approved soil having CBR not less then 12, including stacking at quarry.65.61922.560525.225
4Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 39606.8527126
5Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1681.8759.93100794.4691
6Transportation rates for Hume pipes (NP-3) 800 mm to 900 mm dia.15771155
7Rolling and consolidating water bound mecadam coat with any size of metal of any thickness upto 100mm thickness(including rolling screening or binding materials) including watering & filling in depressions which occur during the process with power roller-Excluding hire and running expenses of roller922.536.2833468.3
8Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.151819.5627293.4
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work1518.7548.1873173.375
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work1518.7554.4282650.375
11work charge16500065000
Total Activity 493000
S.NoMaterialQuantityUnit PriceTotal
1NP3 hume pipe dia 900mm2820016400
2PhotoCopy & Stationary2.3224.64
3Transportation of hard moorum1081200129600
4पानी टेकर10120012000
5रोलर10165016500
Total Material 175000