S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 756 | 63.67 | 48134.52 |
2 | Transportation of metal | 756 | 200 | 151200 |
3 | Transportation rates for Lime (fat), Hydraulic or any other. | 870.19 | 157 | 136619.83 |
4 | Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m | 145.8 | 11.6 | 1691.28 |
5 | Site clearance, cutting grass, raking into heaps and removing off the premises | 600 | 1.8 | 1080 |
6 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 302.4 | 411 | 124286.4 |