State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: BADGAON PIPLOD
Work Code: 1725007005/RC/22012034207270 (खेत सडक निर्माण गोपाल सीताराम के खेत से राधेश्‍याम)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/2/2014 Work start date : 10/2/2014
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1914............. Sanction Date : 19/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
477000 1022000 0 0 0 0 0 1022000 0 1499000
Financial Sanction Details
Financial\Administrative Sanction No: 24........... Financial\Administrative Sanction Date 21/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:1499000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1499000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises2701.6432
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.20004.18200
3Mud Mortar000
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil420.2481.234123.488
5Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Dense or hard soil9589.68512
6Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil78.3788.36920.071
7Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Hard moorum37.51053937.5
8Dag-beling-Double spade "v" shaped stroke 100mm deep12000.5600
9Filling foundation and around masonry work with moorum I/c ramming layers and watering.84.74145.412321.196
10Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)22.83177.872453.84
11Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)226.962478.2562452.272
12Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used22.8118.62704.08
13False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift443.68199.788602.896
14False work for R.C.C. and P.C.C. work in plinth and foundation0.110.1
15Collection of approved soil having CBR not less then 12, including stacking at quarry.860118.8102168
16Transportation of metal 223.63294.565859.035
17Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1211.63120.69146231.6247
18Transportation rates for Hume pipes (NP-3) 800 mm to 900 mm dia.30593.9517818.5
19Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.786023.620296
20Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.302295.568865
21Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making420.2419.18026.584
22Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact86023.720382
23Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau180721.7129906
24Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:75349.126182.5
25work charge100920.0592005
Total Activity 1499000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL19.38120023256
240 mm Metal204.25900183825
3Cement000
4CEMENT(BEGS)1100300330000
5Centering and Shuttering443.688035494.4
6Compaction of Earth Work000
7Compaction of GSB000
8Compaction of Selected soil000
9contigency101001000
10Dieasel Pump156009000
11Display board125002500
12HumePipes303500105000
13Kilometre Stone (ordinary)40031200
14Lime Powder45002000
15mason perday243007200
16mixer machin (perday)2485020400
17PhotoCopy & Stationary3032606
18Photograph2025500
19roller15200030000
20SAND111.9380089544
21Transportanion of hard Muram84.741008474
22Transportation of GSB18030054000
23Transportation Of Material501507500
24Transportation Of Selected Soi86010086000
25Transpotation Charges45002000
26WATER TENKAR15150022500
27रोलर000
28सम्‍पूर्ण सामाग्री क्रर्य000
Total Material 1022000