Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Jun-2024 05:44:43 PM 
Back  
State: MADHYA PRADESH District: DHAR Block: NALCHHA Panchayat: Pipalya
Work Code: 1722005013/RC/22012034539564 (Construction of Sudur Gram Sampark Sadak Mangrol Marg se Siloda tak Village Pipliya )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/6/2020 Work start date : 20/9/2020
Present status : Earthern road Proposed Status : Construction of Gravel Road Roads for Community
Tech Sanction Details
Technical Sanction No. : 1722005/2020-2021/351592/TS Sanction Date : 16/9/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
705209.33 720424.44 338.23 4268.08 0 0 0 726000 0 1430240.08
Financial Sanction Details
Financial\Administrative Sanction No: 1722005/2020-2021/351592/AS Financial\Administrative Sanction Date 20/9/2020
Fin. Sanc. Amt. (in Rs) NREGA:1430528 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1431000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(XX) 20 Km. Lead150320.24286666666748036.43
2(X) 5.0 Km. Lead4390152.112792710706667775.16
3Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Technical Specification Clause 401 of Specification for Rural Roads.i/c all leads of water etc. complete.67562.476992592592642171.97
4(d) 600 mm dia.181672.4644444444430104.36
5Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complete compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete.386523.932584734799592499.44
6(A) With Reinforced cement concrete (ii) Ordinary Kilometer Stone (Pre cast)21601.3953202.79
7(A) With Reinforced cement concrete (iii) 200 m stone (precast)4485.711942.84
8Site clearance, cutting grass, raking into heaps and removing off the premises70002.6254585714285718378.21
9Collection/Excavation of Graval Material meeting the requirements of Hard Moorum as detailed in RES SOR chaper 03 Notes Clause 3.2© including stacking and all leads and lifts up to loading point at quarry.525208.25900952381109335.98
10Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry.150182.49527374.25
11Spreading of material, mixing by mix in place method by manual means or by Tractor mount disk herrows to meet the requirements of Grading and Plasticity given in clause 2.2.2.2, 2.2.2.3, 2.2.3.1 and 2.2.3.2 of IRC:SP:77-2008. and grading by tractor mount grader to get the required profile.675129.60558518518587483.77
12Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.38653.6001811125485113914.7
13Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.386573.668936610608284730.44
14Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13578.363578.36
Total Activity 1431000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.08388573.455
20038-Tractor with ripper attachment9.2056212419552.6944
30055-Smooth Wheeled Roller 8 to 10 tonne129.519523630566.602
40057-Water Tanker 5 to 6 KL Capacity89.67511810581.65
50084-Hire charges of Diesel truck - 9 tonne (without POL)154.32572242345998.2194
60297-Stone Aggregate(single size): 10 mm nominal size0.080363050.589
70367-Portland Cement0.323855111784.4618
80368-White cement 0.0004157446.2976
90763-Glue 1.87.9514.31
100830-Enamel paint0.7887160.13126.294531
110982-Coarse sand (zone III)0.0721028.1674.02752
120983-Fine sand (zone IV)0.37551076.25404.131875
131005-Twisted steel/deformed bars0.1295428700.212
141235-Diesel oil1838.64868125028.064
155001-Mobil oil65.0702182.911901.33958
167335-Binding wire0.122955.586.830782
177900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
18MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.4446525233.415
19MR6032-Snowcem/ durocem0.00072778919.4523
20MR6039-Water5380500.0526902.5
21MR6041-RCC NP-3 pipe 600mm(based on LUN rate)181235.5622240.08
22MR6042-RCC NP-3 collar 600mm(based on LUN rate)5.4177.78960.012
23MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.1846682125.8972
24MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver17.392570812313.89
Total Material 611000