Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:30:50 AM 
Back  
State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: DANGICHA
Work Code: 1719006032/RC/22012034198260 (cc road pp II nrega mahuwakhedi hend pump to gopal)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2013 Work start date : 9/1/2014
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 32/001 Sanction Date : 18/9/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
91450 59950 0 0 325000 0 0 385000 0 476400
Financial Sanction Details
Financial\Administrative Sanction No: 32/02 Financial\Administrative Sanction Date 20/9/2013
Fin. Sanc. Amt. (in Rs) NREGA:151400 Panchparmeshwar
325000
Scheme 2
0
Scheme 3
0
Total
477000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)125.182574.9322325.982
2Labour only for item no. 0413 (for any proportion of cement concrete)125.18392.249095.596
3False work for R.C.C. and P.C.C. work in plinth and foundation111.1153.117009.41
4Deduct for concrete unvibrated in item no. 042511815618408
5Transportation of metal 121.4750.676154.8849
6Transportation of metal 110.15166.418328.96
7Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.56.33149.768435.9808
8Loading of metal in truck, dumper etc.121.4726.283192.2316
9Unloading of metal in truck, dumper etc.121.4713.141596.1158
10Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.121.47414980.27
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work131.8481.210705.408
12Collection of soft moorum including stacking at quarry.121.47112.813701.816
13contingency124002400
Total Activity 477000
S.NoMaterialQuantityUnit PriceTotal
140 mm Metal110.1570077105
2Cement795270214650
3Centering and Shuttering111.195.710632.27
4Centring & Shuttering000
5contangency and work charges144004400
6murrom050.670
7sand cum56.3360033798
8Transportanion of hard Muram121.4750.676154.8849
9Transportanion of sand56.33149.768435.9808
10transpotation of matel110.15166.418328.96
11Vibrator (Per Day)6001911400
Total Material 385000