State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: MALGAON
Work Code: 1725006033/IF/1000007811 (कपिलधारा कूप सह मेढबंधान निर्माण कार्य बाबूलाल हरि)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/6/2012 Work start date : 15/6/2012
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 0791 Sanction Date : 13/6/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
135000 70000 0 0 0 0 0 70000 0 205000
Financial Sanction Details
Financial\Administrative Sanction No: 015 Financial\Administrative Sanction Date 15/6/2012
Fin. Sanc. Amt. (in Rs) NREGA:205000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
205000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum24.82421042.44
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)45.3122410149.44
3Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size)6.332557.616189.608
4False work for R.C.C. and P.C.C. work in plinth and foundation127128.616332.2
5Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars17851.79202.6
6Transportation of metal 13.2117.951556.94
7FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Black trap, basalt or granite15418.16271.5
8Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil252.1775.318988.401
9Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum2797.82640.6
10Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.262468122616
Total Activity 205000
S.NoMaterialQuantityUnit PriceTotal
1BULLOCK CART103003000
2CEMENT.5130015300
3Centering and Shuttering410004000
4Display board115001500
5false (work) (sentring)149.1678813126.696
6Gitti 20 MM7.48045949.6
7hol2157015050
8IRON SARIYA18048.0468648.28
9Photo copy4002800
10sand (t)3.839683.62624.3404
11Transpotation Charges111
Total Material 70000