S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 1000 | 1000 |
2 | Contingency | 19.23 | 1000 | 19230 |
3 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 1250.5 | 23.9 | 29886.95 |
4 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 1650.54 | 12.8 | 21126.912 |
5 | TRANSPORTATION OF MATERIAL | 360 | 1000 | 360000 |
6 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 745.17 | 212.1 | 158050.557 |
7 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 165.5 | 119.7 | 19810.35 |
8 | Lossening of hard soil by ploughing the existing gound | 4095.85 | 2.7 | 11058.795 |
9 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 4095.85 | 50 | 204792.5 |