S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 0 | 1500 | 0 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 12000 | 1.8 | 21600 |
3 | Work charge | 1 | 39000 | 39000 |
4 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil | 0.14 | 76 | 10.64 |
5 | Boring holes 3.5m deep in ordinary soil (for cast in situ piles) and getting out the soil (under ramming if any shall be paid for separately) and disposal of the surplus excavated soil as directed within a lead of 50m for-Diameter of piles.-200 mm | 10 | 178.3 | 1783 |
6 | Boring holes 3.5m deep in ordinary soil (for cast in situ piles) and getting out the soil (under ramming if any shall be paid for separately) and disposal of the surplus excavated soil as directed within a lead of 50m for-Diameter of piles.-250 mm | 2 | 178.3 | 356.6 |
7 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 24.08 | 156.3 | 3763.704 |
8 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 0.14 | 2249 | 314.86 |
9 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size) | 2.598 | 3665.5 | 9522.969 |
10 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 0.436 | 3665.5 | 1598.158 |
11 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 14.192 | 182.9 | 2595.7168 |
12 | False work for R.C.C. and P.C.C. work in plinth and foundation | 1.2 | 182.9 | 219.48 |
13 | Add for Fly Ash brick in item no.0603 and 0605 | 2.518 | 3082.3 | 7761.2314 |
14 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 1347.46 | 63.6 | 85698.456 |
15 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 203.963 | 52.5 | 10708.0575 |
16 | White washing whith lime on undecorated wall surfaces (3coats) to give an even shade including thoroughly broomed the surface to remove all dirt, dust, mortar drops and other foreign matter. | 1.2 | 10.3 | 12.36 |
17 | Collection of pitching stones size 20 to 25cm and not less then 0.021cum (without dressing)-Other then black trap Basalt or granite | 288.42 | 616.6 | 177839.772 |
18 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 3600 | 14.4 | 51840 |
19 | Transportation of metal | 1800 | 105.66 | 190188 |
20 | Transportation of metal | 288.42 | 99.6 | 28726.632 |
21 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 3600 | 21.5 | 77400 |
22 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 3600 | 87.3 | 314280 |
23 | Labour only for Random/ uncoursed rubble masonry in plinth and foundation, stones laid dry, well bounded, faced with selected stones and built with through stones evenly placed at the rate of two per sqm. | 288.42 | 526.4 | 151824.288 |
24 | 1902 Transportion of metal | 1000 | 120 | 120000 |