Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 06:03:28 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: MALUD
Work Code: 1725001028/RC/22012034343310 (sudoor sampark shankar ke khet se sawai sing thavriya ke khet tak)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2017 Work start date : 15/6/2017
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 437/6/2017 Sanction Date : 15/5/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
210000 210000 0 0 0 0 0 210000 0 420000
Financial Sanction Details
Financial\Administrative Sanction No: 58/6/2017 Financial\Administrative Sanction Date 22/6/2017
Fin. Sanc. Amt. (in Rs) NREGA:420000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
420000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Deduct from items 0102 for uprooting not done.10000330000
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)2282.7818261.6
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)19281.52892
4False work for R.C.C. and P.C.C. work in plinth and foundation155.3304659
5Double levelling for transfer of bench marks.-Upto15 m interval381613816
6Collection of approved soil having CBR not less then 12, including stacking at quarry.114.670080220
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.92.161400129024
8Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1200 mm dia.3853623118
9Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making61.547529212.5
10Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact24.7150037050
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.115852.761026.6
Total Activity 420000
S.NoMaterialQuantityUnit PriceTotal
140 mm Metal610006000
2Cement5030015000
3Centering and Shuttering301103300
4Gravel or moorum63515095250
5mason103003000
6Moorum32511738025
7अन्‍य कर्य11400014000
8रेत810008000
9रोलर110024.727170
Total Material 210000