S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (b) C.C. 1:3:6 (1cement, 3sand, 6metal) | 70.56 | 3159.36876417234 | 222925.06 |
2 | False work for R.C.C. and P.C.C. work in plinth and foundation. | 96 | 164.450520833333 | 15787.25 |
3 | (II) 1.0 Km. Lead | 2394 | 96.8038053467001 | 231748.31 |
4 | (a) 900 mm dia. | 15 | 3181.53466666667 | 47723.02 |
5 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete. | 834 | 17.3451438848921 | 14465.85 |
6 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complet compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete. | 1560 | 19.1125705128205 | 29815.61 |
7 | Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7), i/c all leads and lifts of materials etc. complete. | 281.6 | 291.746875 | 82155.92 |
8 | (b) Above item having material strength not less than 30%CBR | 264 | 547.9125 | 144648.9 |
9 | Site clearance, cutting grass, raking into heaps and removing off the premises | 3200 | 2.625459375 | 8401.47 |
10 | b (i) Dense or hard soil for Road Work | 834 | 134.187505995204 | 111912.38 |
11 | c (i) Hard moorum for Road Work | 1560 | 178.630397435897 | 278663.42 |
12 | Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine. | 2430 | 3.60018106995885 | 8748.44 |