S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 67.5 | 882 | 59535 |
2 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 22.5 | 3307.4 | 74416.5 |
3 | Labour only for item no 0504 | 1 | 37526 | 37526 |
4 | Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:8 (1cement, 8sand) | 189 | 1858.7 | 351294.3 |
5 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing | 420 | 127.6 | 53592 |
6 | Transportation of metal | 86.63 | 253.7 | 21978.031 |
7 | Transportation of sand | 90.94 | 320.13 | 29112.6222 |
8 | Transportation rates for Masonry stone. | 189 | 257.18 | 48607.02 |
9 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 28.85 | 123.03 | 3549.4155 |
10 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 17.95 | 320.13 | 5746.3335 |
11 | SIGN BOARD | 1 | 5000 | 5000 |
12 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 405 | 52.7 | 21343.5 |
13 | contingency | 1 | 21299.2778 | 21299.2778 |