State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: BILLOD MAL
Work Code: 1725001006/IF/9926731199 (KAPIL DHARA - GOVIND MUNSHI )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 26/1/2014 Work start date : 1/3/2014
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 00747/14 Sanction Date : 28/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
144000 96000 0 0 0 0 0 96000 0 240000
Financial Sanction Details
Financial\Administrative Sanction No: 0053/14 Financial\Administrative Sanction Date 1/3/2014
Fin. Sanc. Amt. (in Rs) NREGA:240000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
240000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil43.1986.253725.1375
2Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Loose or soft soil22555.812555
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead140.6321.93079.797
4Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m000
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)6.33341821635.94
6False work for R.C.C. and P.C.C. work in plinth and foundation127154.219583.4
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars17865.911730.2
8Transportation of metal 5.38214.51154.01
9Transportation of metal 9.13193.051762.5465
10FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Black trap, basalt or granite13.5418.15644.35
11Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil27.1790.12448.017
12Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum27.17117.13181.607
13Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)54.34273.114840.254
14Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.254.22479.9122000.178
15Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)396.8312.65000.058
16work charge109.5610010956
Total Activity 240000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL5.3810005380
2Blasting Holas40010040000
3Cement4131012710
4Centering and Shuttering1279011430
5Display board125002500
6MASON (PERDAY)123504200
7sand (t)9.1310009130
8STEEL178488544
9Transpotation Charges121002100
Total Material 96000