State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: CHHAIGAON DEVI
Work Code: 1725006015/IF/13 (कपिलधारा कूप सह मेढ बंधान कार्य आत्‍माराम सुखराम रेहमापूर (छैगांवदेवी))
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 18/11/2011 Work start date : 22/11/2011
Present status : Existing Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 0703 Sanction Date : 21/11/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
91000 59000 0 0 0 0 0 59000 0 150000
Financial Sanction Details
Financial\Administrative Sanction No: 00133 Financial\Administrative Sanction Date 22/11/2011
Fin. Sanc. Amt. (in Rs) NREGA:150000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
150000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)10.0212557.625629.7096
2False work for R.C.C. and P.C.C. work in plinth and foundation178.5128.622955.1
3Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars200.251.710350.34
4Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil22.6775.31707.051
5Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum44.3497.84336.452
6Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)68.01239.516288.395
7Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.112.8404.5945637.752
8Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring chiselling (where blasting is prohibited)39.2586.823002.56
Total Activity 150000
S.NoMaterialQuantityUnit PriceTotal
110 mm -  M.S. rod145004500
220 M.M. METAL.8.528507242
340 mm Metal120002000
4Blasting Holas132.57709279.9
5BULLOCK CART94003600
6Cement1250250
7Cement(bori)5031015500
8Centering and Shuttering110001000
9CONTANGANCY2.925001460
10Display board115001500
11IRON SARIYA122.5163.37754.883
12Sand120002000
13Sand Transportation4.37503225
14sattring123.428810860.96
Total Material 70200