S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 0 | 200 | 0 |
2 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 1 | 240678 | 240678 |
3 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 1 | 9393 | 9393 |
4 | Lossening of hard soil by ploughing the existing gound | 1 | 238561 | 238561 |
5 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 1 | 228651 | 228651 |