Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:29:27 PM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: LALGAON
Work Code: 1713004009/RC/22012034212339 (खेत सड़क क्योटी कटरा मुख्य मार्ग से अंजनी महापात्र)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 20/2/2014 Work start date : 7/3/2014
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 4009/2048 Sanction Date : 23/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
638000 435000 0 0 0 0 0 435000 0 1073000
Financial Sanction Details
Financial\Administrative Sanction No: 4009/52 Financial\Administrative Sanction Date 28/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:1073000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1073000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises57401.69184
2Cutting down trees (exceeding 30cm girth, grubbing uproot, filling pits and levelling off ground, lopping branches, trimming, removing not exceeding 50meter & staking serviceable material and cleaning site.-Girth exceeding 30 cm and not exceeding 100 cm1715.3715.3
3Dag-beling-Single spade stroke minimum 75mm deep27000.2540
4Labour only for item no.0402167.235.85985.76
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)12.062343.828266.228
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)1.53400.45100.6
7Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)39.1575185572637.1625
8Transportation of metal 1384.32102.69142155.8208
9Transportation of metal 821.94102.6984405.0186
10Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.000
11Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.688.5259.56178707.06
12Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 100 Kms.19302.499302.49
13Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.39.15751405482.05
14Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.2.723110299.53
15Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN46568.631899
16Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia15309.44641
17Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.37.53476130350
18Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1541.521.533142.25
19Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact148526.238907
20Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)148.539.65880.6
21Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work522.4581.242422.94
22Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil40.5888.33583.214
23Collection of puddle earth including stacking at quarry2115.55112.8238634.04
Total Activity 1073000
S.NoMaterialQuantityUnit PriceTotal
12049-Construction of gravel su000
2Cement1.73380657.4
3contigency11800018000
4hard shoulder compaction135.539.65365.8
5Moorum4.0253501408.75
6pf RCC hume pipe 100018512.69226.8
7roller118526.231047
8roller 8 to 101541.521.533142.25
9Transportanion of Soft Muram488.5350170975
10Transportation of embankment s2279.5563.27144227.1285
11Transportation of Water3366.5620199
Total Material 435000