S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 5740 | 1.6 | 9184 |
2 | Cutting down trees (exceeding 30cm girth, grubbing uproot, filling pits and levelling off ground, lopping branches, trimming, removing not exceeding 50meter & staking serviceable material and cleaning site.-Girth exceeding 30 cm and not exceeding 100 cm | 1 | 715.3 | 715.3 |
3 | Dag-beling-Single spade stroke minimum 75mm deep | 2700 | 0.2 | 540 |
4 | Labour only for item no.0402 | 167.2 | 35.8 | 5985.76 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 12.06 | 2343.8 | 28266.228 |
6 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 1.5 | 3400.4 | 5100.6 |
7 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand) | 39.1575 | 1855 | 72637.1625 |
8 | Transportation of metal | 1384.32 | 102.69 | 142155.8208 |
9 | Transportation of metal | 821.94 | 102.69 | 84405.0186 |
10 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms. | 0 | 0 | 0 |
11 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 688.5 | 259.56 | 178707.06 |
12 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 100 Kms. | 1 | 9302.49 | 9302.49 |
13 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 39.1575 | 140 | 5482.05 |
14 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 2.723 | 110 | 299.53 |
15 | Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN | 465 | 68.6 | 31899 |
16 | Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia | 15 | 309.4 | 4641 |
17 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia. | 37.5 | 3476 | 130350 |
18 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 1541.5 | 21.5 | 33142.25 |
19 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact | 1485 | 26.2 | 38907 |
20 | Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7) | 148.5 | 39.6 | 5880.6 |
21 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work | 522.45 | 81.2 | 42422.94 |
22 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 40.58 | 88.3 | 3583.214 |
23 | Collection of puddle earth including stacking at quarry | 2115.55 | 112.8 | 238634.04 |