Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:17:43 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: ROSHIYA
Work Code: 1725006041/RC/22012034185916 (पंचपरमेश्‍वर सी0 क्रां0 सह नाली निर्माण सोनिया के )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 27/7/2013 Work start date : 5/9/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 254/2013 Sanction Date : 27/7/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
185000 123000 0 0 400000 0 0 523000 0 708000
Financial Sanction Details
Financial\Administrative Sanction No: 20/2013 Financial\Administrative Sanction Date 5/9/2013
Fin. Sanc. Amt. (in Rs) NREGA:308000 Panchparmeshwar
400000
Scheme 2
0
Scheme 3
0
Total
708000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep682.50.5341.25
2Dag-beling-Double spade "v" shaped stroke 100mm deep000
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)95.553296314932.8
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)79.632478.2197339.066
5False work for R.C.C. and P.C.C. work in plinth and foundation216.13154.233327.246
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)170.636.31074.969
7Collection of approved soil having CBR not less then 12, including stacking at quarry.192.6141.727291.42
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 192.67.51444.5
9Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 95.55403822
10Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.263.24205.554095.82
11Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.192.6107.620723.76
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work174.0497.717003.708
13work charge13600036000
Total Activity 708000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL74814.560273
240 mm Metal65764.549692.5
3CEMENT(BEGS)868305264740
4Centering and Shuttering196149.5329307.88
5contengency8360028800
6Display board125002500
7mason perday203507000
8Mixer Machien6023013800
9murrom174107.8418764.16
10photocopy310003000
11Photograph4720940
12SAND569.86939316.2
13Thermocoal2010200
14Transportation charges401004000
Total Material 523000