S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Labour only for cement lime mortar | 1 | 122600 | 122600 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 1 | 100000 | 100000 |
3 | False work for R.C.C. and P.C.C. work in plinth and foundation | 50 | 147.8 | 7390 |
4 | Coursed rubble masonry second sort in plinth and foundation.-In Lime mortar 1:2 (1lime putty, 2sand) | 236.25 | 1858.7 | 439117.875 |
5 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing | 525 | 127.6 | 66990 |
6 | Providing and fixing M.S. fan clamps of 16mm dia mild steel in existing RCC slab including cutting chase and making good. | 52.5 | 882 | 46305 |
7 | Repairs to plaster in patches of 2.50 sqm and under and 10 to 15mm thick including cutting the patch in proper shape and replastering the surfaces of the walls including disposal of rubbish to the Camping ground within a lead of 50 metres with.-Cement mortar 1:3 (1Cement, 3Sand) | 375 | 211.4 | 79275 |
8 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 420 | 96.2 | 40404 |