State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: ROHNAI
Work Code: 1725006040/IF/40 (कपिलधारा सह मेढ बंधान कार्य हिरालाल मयाराम (रोहनाई)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2010-2011 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 18/1/2011 Work start date : 28/1/2011
Present status : Existing Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : _739 Sanction Date : 28/1/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
98000 33000 0 0 0 0 0 33000 0 131000
Financial Sanction Details
Financial\Administrative Sanction No: _010 Financial\Administrative Sanction Date 28/1/2011
Fin. Sanc. Amt. (in Rs) NREGA:131000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
131000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil43.234.41486.08
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil192.1938.27341.658
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead96.9151453.5
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size)5.092445.312446.577
5False work for R.C.C. and P.C.C. work in plinth and foundation102125.112760.2
6Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars14346.36620.9
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 12.772383039.26
8Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil4061.72468
9Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum4080.23208
10Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)45.35192.818743.9335
11Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.198308.9561172.1
12work charge11025010250
Total Activity 131000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL.225005000
2BULLOCK CART62501500
3Cement(bori)35297.1410399.9
4Centering and Shuttering130607800
5CONTANGANCY118371837
6Sand216003200
7sariya77.7423263.4
8Transportation charges of material1100100
Total Material 33100