State: MADHYA PRADESH District: NARSINGHPUR Block: BABAI CHICHLI Panchayat: BARHA BADA
Work Code: 1734004056/RC/22012034183911 (सीसीरोडएवंनालीनिर्माणसिंगलबसोरकेघरसेराजोरियाकेमकान)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 26/4/2013 Work start date : 20/9/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 71/13-14 Sanction Date : 10/7/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
117600 78900 0 0 250000 0 0 329000 0 446500
Financial Sanction Details
Financial\Administrative Sanction No: 2/13-14 Financial\Administrative Sanction Date 29/8/2013
Fin. Sanc. Amt. (in Rs) NREGA:196500 Panchparmeshwar
250000
Scheme 2
0
Scheme 3
0
Total
447000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.110.49253.127965.019
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)68.762634.4181141.344
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)53.662021.8108489.788
4False work for R.C.C. and P.C.C. work in plinth and foundation114.04139.115862.964
5Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 50 Kms. and part there of upto 100 Kms.108.6659164218.06
6Transportation of sand187.91175.532978.205
7Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7110.4921.32353.437
8Site clearance, cutting grass, raking into heaps and removing off the premises637.261.5955.89
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work70.0673.45142.404
10Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.637.2611.67392.216
Total Activity 447000
S.NoMaterialQuantityUnit PriceTotal
1cc 1:2:468.762229153266.04
2CC 1:3:653.661616.486736.024
3CEMENT(BEGS)28727578925
4Centring & Shuttering114.0488.110046.924
Total Material 329000