State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: DIWAL
Work Code: 1725007024/WC/22012035055511 (अमृत सरोवर निर्माण कार्य रामसिंग के खेत पास दिवाल )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 20/8/2022 Work start date : 20/2/2023
Present status : Non-existent Proposed Status : Construction of Mini Percolation Tank for Comm
Tech Sanction Details
Technical Sanction No. : 767/2023 Sanction Date : 4/3/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Public Contribution scheme2 scheme3 Total
1071000 1081000 0 0 10000 0 0 1091000 0 2162000
Financial Sanction Details
Financial\Administrative Sanction No: 21/2023 Financial\Administrative Sanction Date 15/3/2023
Fin. Sanc. Amt. (in Rs) NREGA:2152000 Public Contribution
10000
Scheme 2
0
Scheme 3
0
Total
2162000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises2642.747.0218552.0348
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil1402.5144.07202058.175
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum1333.34191.9255867.946
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)28.35611.7717343.6795
5Dag-beling-Double spade "v" shaped stroke 100mm deep131.03172.8922653.7767
622cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014559.552379.21212187.71392
7Collection of puddle earth including stacking at quarry428.24194.5683318.3744
8Transportation of metal 428.24155.3966544.2136
9Transportation of metal 130.03172.6422448.3792
10Transportation of metal 1427.12155.39221760.1768
11Transportation of metal 000
12Transportation of metal 000
13Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making3227.481445184.72
14FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.428.24452.89193945.6136
15FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 80 mm nominal size16.2334.625420.844
16Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work000
17Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work1613.74144.08232507.6592
18Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work55.3144.087967.624
19Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work1613.74191.91309692.8434
20Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Tank Work165.8191.9131818.678
21Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work55.3609.8533724.705
22Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Dence or hard soil (PT/60/60)000
23Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti2259.279.097178695.9424
Total Activity 2162000
S.NoMaterialQuantityUnit PriceTotal
1417 Rollar3227.482374232.04
2Hearting Soil1613.74155.39250759.0586
3Lead of Casing Soil 5.00 Km1613.74155.39250759.0586
4pitching stone559.55315176258.25
5Transpotation of Puddle Earth428.24452.89193945.6136
6काली मिटटी328155.3950967.92
7पानी टेकर1396.4955.5477561.0546
8सम्‍पुर्ण सामाग्री क्रय11200012000
9साईनबोर्ड 145004500
Total Material 1091000