State: MAHARASHTRA District: BEED Block: ASHTI Panchayat: JAMGAON
Work Code: 1818007048/IF/1235434297 (JSV BHAUSAHEB PANDIT DHAS)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat (3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2022 Work start date : 1/7/2022
Present status : Not Exist Proposed Status : Constr of Irrigation Open Well for Individuals
Tech Sanction Details
Technical Sanction No. : 1818007/2022-2023/221349/TS Sanction Date : 30/3/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
168623.52 131172.3 2993.47 2801.17 0 0 0 137000 0 305590.46
Financial Sanction Details
Financial\Administrative Sanction No: 1818007/2022-2023/221349/AS Financial\Administrative Sanction Date 31/3/2023
Fin. Sanc. Amt. (in Rs) NREGA:305591 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
306000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Excavation in earth for all sorts of soil & silt, lime, shadu, sand/ grit, such types of strata including dressing and conveying the excavated material by head and upto a distance of 10m and laying or spreading or filling in furrahas in layers of 30cm thick upto lift of 1:50m as directed. (C) Excavation for well- Rate for the other area75.36135.93604033970310244.14
2Excavation in earth for soft murum type of strata including dressing and converying the excavated material by head load upto a distance of 10m and laying or spereading or filling in furrahas in layers of 30cm. Thick upto a lift of 1.50m as directed. (B) Excavation in well- Rate for the other area57.698171.5199833616429896.36
3Excavation in earth for hard murum type of strata including dressing and conveying the excavated material by head load upto a distance of 10m and laying or spreading or filling in furrahas in layers of 30cm thick upto a lift of 1.50 m as directed. (B) Excavation for well- Rate for the other area42.39234.4961075725419940.29
4Excavation in earth for hard murum containing boulders upto size of 0.1 cum type of strata, including dressing and converying the excavaed material by headload upto a distance of 10m and laying or spreading or filling in furrahas in layers of 30cum. thick upto lift of 1.50m as directed. (B) Excavation for well- Rate rate for the other area58.876277.50407636388316338.33
5Excavation in soft rock type of strata including dressing and conveying the excavated material by head load upto a distance of 10m and laying or spreading or filling in furreahas in layers of 30cm. Thick upto lift of 1.50m as directed. (B) Excavation for well- Rate for the other area29.438533.24784292411215697.75
6Excavation in Jambhya rock type of strata including dressing and conveying the excavated material by head load upto a lead of 10m and laying or spreading or filling in furreahas in layers of 30cm. Thick upto lift of 1.50m as directed. (B) Excavation for well- Rate for other area49.063694.01585716323934050.5
7Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area. Additional lift 1.5 m in other area.57.69861.87528163887833570.08
8Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area. Additional lift up to 3.00 m in other area.42.3989.08799245104983776.44
9Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area. Additional lift up to 4.50 m in other area.29.438127.9998641212043768.06
10Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area. Additional lift up to 7.50 m in other area.29.438205.6705618588226054.53
11Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit/borrow area. Additional lift up to 9.00 m. (For other area)117.752244.51075140974328791.63
12Providing and laying in situ / ready mix / ready mix M20 RCC work with trap/ granite/ quartzite/ gneiss metal in well steining including shuttering, compacting by vibrating, finishing and curing etc. complete. (fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with natural/artifical sand, excluding reinforcement)7.856421.5834394904550409.43
13Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 3.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary)60169.00066666666710140.04
14Providing and laying in situ cement concrete of grade M-15 of trap / granite / gneiss / quartzite / graded metal for PCC with or without surface reinforcement / RCC concreting requiring heavy or special type of shuttering for works of gallery, sluice, spillway crest, spillway downstream face, energy dissipating structures, intake structures, training walls, piers, abutments etc. with Batching Plant and Transit mixer with shuttering and scaffolding, placing, compacting, curing etc. complete with an initial lead of 5 Km. & lift of 1.5 m. (A) M-15 (20 MSA) (Cement 5.64 bags/Cum)1.135697.371681415936438.03
15Cutting, bending, hooking, laying in position and tying M.S./HYSD/TMT bars for reinforcement of R.C.C. work as per detailed drawing etc. complete.0.42559613.317647058825335.66
16Excavation in Hard Rock of all toughness by blasting including boulders above 0.6 m dia.(0.113Cum) minimising damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling / pre-splitting / smooth blasting techniques and placing the excavated rock neatly in approved dump area as directed including cost of all materials, machinery, labour, leveling bed etc., complete with lead up to 15 m and lift up to 6 m.68.6891021.1131331071970139.24
Total Activity 305000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper8.984704220.6
20011-Hire charges of Pump set of capacity 4000 litres/hour97766984
30012-Vibrator (Needle type 40 mm)8.987006286
40025-Hire and running charges of light crane0.48838931183608966.8277316
50295-Stone Aggregate(single size):20 mm nominal size5.3889915339.508
60296-Stone Aggregate(single size): 12.5 mm nominal size2.6949912669.754
70326-Blasting fuse (fuse wire)51.054704921708679.2998364
80367-Portland Cement2.90916560016291.296
90982-Coarse sand (zone III)4.04116436639.363
103-Display Board / CIB110001000
117335-Binding wire4.2575318.75
12MR6206-steel TMT FE 5000.4254700019975
13MR6207-shuttering(centaring)21.4895184.443963.52338
14MR6325-water89800.21796
15MR6385-electric detonator @1 detonator for 1/2 gelatin stick of 125 gms32.67501115100832936.4112392
Total Material 127000