S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Single spade stroke minimum 75mm deep | 225 | 1 | 225 |
2 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 42.19 | 882 | 37211.58 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 29.53 | 3307.4 | 97667.522 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 112.5 | 147.8 | 16627.5 |
5 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 393.75 | 1079 | 424856.25 |
6 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 125 | 59.1 | 7387.5 |
7 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 1200 | 78.5 | 94200 |
8 | Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading - 3 (Size ranging from 53 mm to 22.4 mm) | 58 | 4000 | 232000 |
9 | Transportation of metal | 15 | 882 | 13230 |
10 | Lossening of hard soil by ploughing the existing gound | 168.75 | 52.7 | 8893.125 |
11 | contingency | 1 | 30000 | 30000 |
12 | TRANSPOTATION OF CEMENT | 1 | 4000 | 4000 |