Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 06:46:04 PM 
Back  
State: MADHYA PRADESH District: DHAR Block: BADNAWAR Panchayat: Khachroda
Work Code: 1722001064/RC/22012034212879 (सी सी रोड - सतकुई गोशाला खाचरोदा)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2013 Work start date : 26/9/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 417/64 Sanction Date : 16/9/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost VIDAYAK NIDHI scheme2 scheme3 Total
55517.42746 34482.57254 0 0 100689.78496 0 0 136000 0 190689.78496
Financial Sanction Details
Financial\Administrative Sanction No: 557/64 Financial\Administrative Sanction Date 26/9/2013
Fin. Sanc. Amt. (in Rs) NREGA:90000.21504 VIDAYAK NIDHI
100689.78496
Scheme 2
0
Scheme 3
0
Total
191000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard115001500
2Dag-beling-Double spade "v" shaped stroke 100mm deep152.280.576.14
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead91.49787.68015.1372
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)27.4172806.676948.5522
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)26.904219058919.76
6Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used27.41726.6729.2922
7False work for R.C.C. and P.C.C. work in plinth and foundation110.599127.114057.1329
8Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)90.7386.2562.5756
9Transportation of metal 55.277108.185979.86586
10Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.55.277412266.357
11Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN31.3816.8527.184
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work91.49781.27429.5564
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Tank Work000
14Collection of hard moorum including stacking at quarry.55.277130.87230.2316
15contingency644816448
Total Activity 191000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL23.629469.1511085.54535
240 mm Metal24.181332.478039.45707
3Cement296.428584474
4contangency and work charges644816448
5FALSE WORK110.59973.58129.0265
6Hire charges of Roaler31.31216.8526.0416
7SAND24.054472.9511376.3393
8SIGNBOARD NO115001500
9Transpotation Charges52.26868.763593.94768
Total Material 136000