State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: CHHAIGAON DEVI
Work Code: 1725006015/IF/10 (कपिलधारा कूप सह मेढ बंधान कार्य छंदईबाई कडवा (छैगा)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 20/11/2011 Work start date : 22/11/2011
Present status : Existing Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 00/702 Sanction Date : 21/11/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
110000 85000 0 0 0 0 0 85000 0 195000
Financial Sanction Details
Financial\Administrative Sanction No: 00/132 Financial\Administrative Sanction Date 22/11/2011
Fin. Sanc. Amt. (in Rs) NREGA:195000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
195000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil47.49421994.58
2Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size)9.042557.623120.704
3False work for R.C.C. and P.C.C. work in plinth and foundation181128.623276.6
4Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars20851.710753.6
5Transportation of metal 13.78119.881651.9464
6Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil252.1745.4511461.1265
7Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum27.1795.12583.867
8Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)63.34224.7314234.3982
9Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.193.7468.0990669.033
10work charge11525315253
Total Activity 195000
S.NoMaterialQuantityUnit PriceTotal
110 mm -  M.S. rod145004500
220 M.M. METAL1381410582
340 mm Metal120002000
4Cement1250250
5Cement(bori)5030515250
6Centering and Shuttering110001000
7Contagecny000
8Display board115001500
9hol140709800
10MASON (PERDAY)103503500
11Photo copy000
12Photograph12020
13R.R. stone (granite)18080
14Sand120002000
15Sand Transportation145697966
16sariya208489984
17Transportation charges115001500
18VAT111
19xerox111
20सेन्‍टीग1818315023
Total Material 85000