The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 06:26:08 PM 
Back  
State: MADHYA PRADESH District: DHAR Block: NALCHHA Panchayat: Silotiya
Work Code: 1722005027/WC/22012034393070 (sarvajanik kup nirman bhilkhedi)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 10/5/2017 Work start date : 30/3/2018
Present status : Non-existent Proposed Status : Constr of Water Absorption Trench Trench for Comm
Tech Sanction Details
Technical Sanction No. : 026(17-18) Sanction Date : 18/5/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
118000 117000 0 0 0 0 0 117000 0 235000
Financial Sanction Details
Financial\Administrative Sanction No: 036(17-18) Financial\Administrative Sanction Date 19/5/2017
Fin. Sanc. Amt. (in Rs) NREGA:235000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
235000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil127.71.36173.672
2Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like.63.5352222.5
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m64.86.18400.464
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)3235.45.3617341.744
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)4488.68.337255.38
6Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime Mortar 1: 2(1lime, 2sand)242114.9836266.58
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars51.794.064862.902
8Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing47.1114.35383.53
9Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum36.93237.58770.875
10Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)58.86573.233738.552
11Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.793.98107.9185678.3818
12Lossening of hard soil by ploughing the existing gound2.736.9399.711
13Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed36.93501846.5
14Field Technical Supervisior Charge-FTSC1343343
Total Activity 235000
S.NoMaterialQuantityUnit PriceTotal
120 MM BT matel7.0558505996.75
240 mm size HG metal13.4826508763.3
3Blasting Holas63510063500
4Cement7030021000
5Centring & Shuttering107.9284.39097.656
6Contengency11202.3371202.337
7Sand5.513101708.1
8singboard114001400
9लोहा94.06454232.7
Total Material 117000