The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 07:10:27 PM 
Back  
State: MADHYA PRADESH District: SATNA Block: UNCHAHARA Panchayat: BRHAREE
Work Code: 1712004016/RC/22012034168220 (P C C ROAD MUKHYA MARG SE RAM BIHARI KE GHAR TAK G)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 21/1/2012 Work start date : 23/8/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 556/2012 Sanction Date : 26/10/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
105000 70000 0 0 323000 0 0 393000 0 498000
Financial Sanction Details
Financial\Administrative Sanction No: 1040/2012 Financial\Administrative Sanction Date 9/11/2012
Fin. Sanc. Amt. (in Rs) NREGA:175000 Panchparmeshwar
323000
Scheme 2
0
Scheme 3
0
Total
498000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Dag-beling-Double spade "v" shaped stroke 100mm deep3600.4144
3Labour only for item no.040284.832.42747.52
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)94.53014284823
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)8.52353.720006.45
6Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used94.5406.238385.9
7False work for R.C.C. and P.C.C. work in plinth and foundation230124.328589
8Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)17061020
9Cement concrete [1:3:6] using 40mm sizeB.H.G. metal including all cost conveyancetaxes,royalit,watering curring, etc. complete000
10Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 84.8131102.4
11Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 103737519
12Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.22.09227.525025.9168
13Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.87.97252.822238.816
14Transportation of sand44.45785.5234916.364
15Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.84.8166.3214103.936
16Contigency000
17Cement concrete [1:2:4] using 12mm size H.G. Chips including all cost conveyancetaxes,royalit,watering curring, etc. complete000
18Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work104.373.47655.62
19Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil5479.94314.6
20Collection of hard moorum including stacking at quarry.84.8118.310031.84
21work charge11855.63721855.6372
22contingency115001500
23Labour difference in case of old SoR680149520
240430 False work for R.C.C. and P.C.C. work in plinth and foundation 000
250317 Dag-beling (b) Double spade "v" shaped stroke 100mm deep 000
262003-labour only for mooram kanker shingle gravel red bajri leavelling to gradient and required camber including dressing000
272513(b) Preparation of subgrade by excavating earth work to the 15cm average depth,dressing to chamber including making good the undulations etc.and disposal of surplus earth with lead upto 20metres and upto 1.5metre (b) Dense or hard soil sqm 11.6000
Total Activity 498000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL80.321238.1399446.6016
240 M.M. METAL7.65788.136029.1945
3CEMENT(BEGS)636290.89185006.04
4CEMENT.000
5Centering and Shuttering23065.214996
6contangency and work charges150005000
7Display board115001500
8Mason Payment (Semi Skilled)5425013500
9mixer machin (perday)128009600
10PhotoCopy & Stationary1785.5391785.5391
11SAND44.461125.8850056.6248
12Vibrator48854080
13Water With Tenkar201503000
Total Material 393000