Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:47:02 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: GADHOTA(P)
Work Code: 1703004021/RC/22012034203011 (खरंजा निर्माण पीपल से मिडिल स्‍कूल की ओर)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2013 Work start date : 7/2/2014
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 2302 Sanction Date : 15/12/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
104008 40924 0 0 0 0 0 41000 0 144932
Financial Sanction Details
Financial\Administrative Sanction No: 21/5 Financial\Administrative Sanction Date 20/12/2013
Fin. Sanc. Amt. (in Rs) NREGA:144932 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
145000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency14347.84347.8
2Dag-beling-Single spade stroke minimum 75mm deep0.220040
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.360215.777652
4Stacking without boxing.-Puddle earth, moorum, sand or kankar103.510.51086.75
5Transportation rates for Masonry stone.54385.5620820.24
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.103.5172.2617828.91
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.103.5414243.5
8Collection of hard moorum including stacking at quarry.103.5130.813537.8
9Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.42012.85376
Total Activity 145000
S.NoMaterialQuantityUnit PriceTotal
1contengency 21274.85274.85
2PhotoCopy & Stationary110001000
3sign board110001000
4खण्‍डा परिवहन54385.5620820.24
5मुरम परिवहन (1)103.5172.2617828.91
Total Material 41000