Work Code: 1702001059/LD/22012034316051 (शान्तिधाम कार्य हमीरापुरा )
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/1/1900 Work start date : 1/1/1900
Present status : NEW Proposed Status : Crematorium
Tech Sanction Details
Technical Sanction No. : 809 TS Sanction Date : 17/1/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
21200 223800 0 0 0 0 0 224000 0 245000
Financial Sanction Details
Financial\Administrative Sanction No: 05/809 Financial\Administrative Sanction Date 26/1/2017
Fin. Sanc. Amt. (in Rs) NREGA:245000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
245000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil19.73127.72519.521
2Filling foundation and around masonry work with moorum I/c ramming layers and watering.21.67247.95371.993
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.622562.84151.736
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)4.1491620155.6
5Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:8 (1cement, 8sand)3.952984.511788.775
6Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height1687.6671.7121005.222
710mm thick cement plaster on fair side of wall in-Cement mortar 1:5 (1cement, 5sand)15.396.21471.86
8Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.80 mm thick sheet.75.2800.360182.56
9Providing ridges or hips 600mm over all in plain G.I. sheet class III fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter G.I. limpet bitumen washers complete.-0.80 mm thick sheet.6.4528.93384.96
10Cement washing (Portland cement) 3 coats.-White cement13.524.9336.15
11Painting two coats (excluding priming coat) on new steel and other metal surfaces with Aluminium paint, brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter.-2 coats150005000
12Field Technical Supervisior Charge-FTSC190009000
Total Activity 245000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL4.210004200
2AngleRod7506548750
3Brick7000428000
4CEMENT(BEGS)302808400
5Centering and Shuttering18.21302366
6Compaction of Earth Work145020.730015
7FTSC-Field Technical supervisi190009000
8Rolling Compaction123.7559.77387.875
9Sand6.128004896
10sariya3505017500
11singboard115001500
12steel work2406014400
13Tean Shad2506516250
14Transpotation Charges13100031000
Total Material 224000