Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:00:13 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: SAKRAYA
Work Code: 1702001037/WC/22012034968103 (Naveen dug pond bajriya ke pass sakaraya)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 16/4/2022 Work start date : 12/5/2022
Present status : Non-existent Proposed Status : Constr of Earthen Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 1702001/2022-2023/96667/TS Sanction Date : 13/5/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
616828.99 336734.3 38040.87 7918.11 0 0 0 383000 0 999522.27
Financial Sanction Details
Financial\Administrative Sanction No: 1702001/2022-2023/96667/AS Financial\Administrative Sanction Date 15/5/2022
Fin. Sanc. Amt. (in Rs) NREGA:999517 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1000000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dense or hard soil4029.85472636815923961.6
2(III) Lead upto 200 meters524.7116.6431294072861202.65
3(I) 1.50 m. to 3.00 m.1732.510.483561327561318162.77
4(II) 3.00 m to 4.50 m60518.3611107.8
5(b) C.C. 1:3:6 (1cement, 3sand, 6metal)5.43202.6333333333317294.22
6(e) In Cement mortar 1:6 (1cement, 6sand)20.252899.0320987654358705.4
7Providing stone chips under stone pitching140.7457.81272210376764414.25
8(XXIX) 50 Km. Lead140.85807.863613773518113787.59
9Stripping the seat of embankment of all foreign materials, vegetation and other growth like grass grass roots etc. and removing and rubbish up to a suitable distance including dressing but excluding jungle clearance etc. complete.330158.36724242424252261.19
10Site clearance, cutting grass, raking into heaps and removing off the premises28802.818913194444448118.47
11(b) Dense or hard soil (PT/45/45)21.6178.6759259259263859.4
1222cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum402379.20539800995152440.57
13Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry.80.4195.94203980099515753.74
14Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.50603.6001798418972318216.91
15Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.506079.0971758893281400231.71
Total Activity 1000000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper1.0665885943.8525
20084-Hire charges of Diesel truck - 9 tonne (without POL)20.3836883224245700.2291686
30367-Portland Cement3.0702375551116920.0788625
40982-Coarse sand (zone III)0.90416251028.16929.623716
50983-Fine sand (zone IV)9.6882751076.2510427.00596875
61157-Stone for masonry work23.49519.7512208.9275
71158-Stone for pitching 15 cm x 22.5 cm120.631537989
81235-Diesel oil536.525611656836483.7415922
92903-Stone chippings/ screenings 4.75 mm nominla size140.735750229.9
105001-Mobil oil19.18333899182.93508.632701271
11MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT4.76043755252499.2296875
12MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)1.75776821198.7514
13MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver22.7770816121.16
Total Material 236000