Work Code: 1713004011/LD/22012034297280 (Ts no. 1461 शांतीधाम का निर्माण एवं समतलीकरण शुक्‍ला तालाब के पास)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/1/1900 Work start date : 1/1/1900
Present status : NEW Proposed Status : Repair & maint of Bitumen Top Roads for Comm
Tech Sanction Details
Technical Sanction No. : 1461/11/11 Sanction Date : 4/12/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
524000 330000 0 0 0 0 0 330000 0 854000
Financial Sanction Details
Financial\Administrative Sanction No: 04/11/11 Financial\Administrative Sanction Date 5/12/2016
Fin. Sanc. Amt. (in Rs) NREGA:854000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
854000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard015000
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.24001.84320
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)2.5122495644.99
4False work for R.C.C. and P.C.C. work in plinth and foundation58.59182.910716.111
5Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement lime mortar 1:2:9 (1cement, 2lime, 9sand)1307000307000
6Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars648.6152.534052.025
7Collection of approved soil having CBR not less then 12, including stacking at quarry.324121.339301.2
8Stacking without boxing.-Puddle earth, moorum, sand or kankar32411.33661.2
9Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 32414.44665.6
10Transportation of metal 415.92105.6643946.1072
11Transportation of metal 324194.2262927.28
12Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.739.925238475.84
13Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN32469.122388.4
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work2079.687.3181549.08
15Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti15911518285
16Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil14.66951392.7
17Lossening of hard soil by ploughing the existing gound415.92121.350451.096
18Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed1039.823.624539.28
Total Activity 854000
S.NoMaterialQuantityUnit PriceTotal
1Bricks16154.77590.5
2CEMENT6427517600
3Compaction of Earth Work111
4Compaction of GSB111
5Display board120002000
6GITTI 20 MM5.61813507584.3
7GITTI ---40 mm2.2612502825
8IRON SARIYA648.6147.730938.697
9Mooram280.83194.2254542.8026
10sand5.7817009826
11Shantidham Type-1 Material877.473105.6692713.79718
12Shantidham Type-2 Material11200012000
13soil transportation111
14Steel Gate175007500
15Transporation of Boulder122.8361675663.28
16Transportation charges of mate186358635
17Transportation of mooram111
18Transpotation Charges111
Total Material 330000