Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:34:52 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: GADHOTA(P)
Work Code: 1703004021/LD/22012034239747 (KHEL MAIDAN GADHOTA)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2015 Work start date : 27/11/2015
Present status : Not Exist Proposed Status : Stone Terracing
Tech Sanction Details
Technical Sanction No. : 21/737 Sanction Date : 1/9/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
709261 337516 0 0 0 0 0 338000 0 1046777
Financial Sanction Details
Financial\Administrative Sanction No: 21/002 Financial\Administrative Sanction Date 8/9/2015
Fin. Sanc. Amt. (in Rs) NREGA:1046777 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1047000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.80004.435200
2Contingency110001000
3Work charge111032.711032.7
4Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.32.487128220.4
5Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing.180194.635028
6Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.115.2983.7113322.24
7Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing288109.131420.8
8Transportation of 20 MM metal40.05490.719652.535
9Transportation rates for Masonry stone.115.2405.346690.56
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.2416.54100.53242934.7662
11Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.240044.1105840
12Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making240031.776080
13Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil97.2959234
14Collection of soft moorum including stacking at quarry.2400121.3291120
Total Activity 1047000
S.NoMaterialQuantityUnit PriceTotal
1Cement30026880400
2Metal 20 mm7.651390.710638.855
3PhotoCopy & Stationary1765.54765.54
4R.R. stone (Laterite)115.2405.346690.56
5Sand (mortar)780.633.873021.0381
6Transpotation Charges245800196000
Total Material 338000