State: MADHYA PRADESH District: NARSINGHPUR Block: BABAI CHICHLI Panchayat: IMALIYA (P)
Work Code: 1734004008/RC/166 (1734004008/RC/166)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 3/10/2012 Work start date : 11/3/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 795-12/13 Sanction Date : 3/11/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
77300 52100 0 0 225100 0 0 278000 0 354500
Financial Sanction Details
Financial\Administrative Sanction No: 5267 Financial\Administrative Sanction Date 7/12/2012
Fin. Sanc. Amt. (in Rs) NREGA:129400 Panchparmeshwar
225100
Scheme 2
0
Scheme 3
0
Total
355000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Work charge586105860
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)65.142435.3158635.442
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)48.391836.888882.752
4False work for R.C.C. and P.C.C. work in plinth and foundation160.98125.120138.598
5Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.21.5161.13463.65
6Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 50 Kms. and part there of upto 100 Kms.100.747047329
7Transportation of sand50.3585.864323.051
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.89.3385.867669.8738
9Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.789.3319.71759.801
10Site clearance, cutting grass, raking into heaps and removing off the premises632.741.4885.836
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work11.1767.8757.326
12Collection of soft moorum including stacking at quarry.89.3394.28414.886
13Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.595.5210.76372.064
Total Activity 355000
S.NoMaterialQuantityUnit PriceTotal
120 mm metal transport56.5747026587.9
2cc 1:2:465.142072.5135002.65
3CC 1:3:648.39147471326.86
4Centring & Shuttering160.9878.712669.126
5Transportation Cement21.5161.13463.65
6transportation of 40mm metal44.1347020741.1
7Transportation of sand50.3552.922664.522
8मुरुम परिवहन89.3352.924727.3436
Total Material 278000