Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 05:21:09 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: KUKSHI RAIYAT
Work Code: 1725001025/IF/617 (कपिलधारा मोनदास भीमा)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/4/2011 Work start date : 10/10/2011
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 000452/11 Sanction Date : 10/10/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
90000 60000 0 0 0 0 0 60000 0 150000
Financial Sanction Details
Financial\Administrative Sanction No: 000014/11 Financial\Administrative Sanction Date 12/11/2011
Fin. Sanc. Amt. (in Rs) NREGA:150000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
150000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)268170.25363.4
2Dag-beling-Single spade stroke minimum 75mm deep6000.2120
3Labour only for item no.0402269.74308092.2
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)6.352557.616240.76
5False work for R.C.C. and P.C.C. work in plinth and foundation97.52154.215037.584
6Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars89524628
7Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil38.1575.32872.695
8Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil199.7790.117999.277
9Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum57.2297.85596.116
10Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)31.79221.77047.843
11Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.152.78401.261295.336
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work6881.65548.8
Total Activity 150000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL.610006000
2Blasting (No)12510012500
3Cement4030012000
4Centering and Shuttering122.358510399.75
5desal pump rent106506500
6Display board120002000
7MASON (PERDAY)93002700
8Photocopy & staionary1300300
9Sand3.510003500
10STEEL89454005
Total Material 60000