S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 5625 | 7.60931733333333 | 42802.41 |
2 | Mud Mortar | 125 | 439.14472 | 54893.09 |
3 | Filling foundation, around masonry work, plinth, sides of foundation etc. with moorum I/c ramming layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m. | 240 | 272.567416666667 | 65416.18 |
4 | Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing. | 209 | 302.386889952153 | 63198.86 |
5 | Filling foundation or under floor with 40mm gauge graded metal and moorum including
ramming in layers and watering. | 22.5 | 1444.41155555556 | 32499.26 |
6 | Random/ uncoursed rubble masonry in plinth and foundation, stones laid dry, well bounded, faced with selected stones and built with through stones evenly placed at the rate of two per sqm | 224.2 | 1248.19455842997 | 279845.22 |
7 | Steel work in built up tubular trusses including cutting, hoisting, fixing in position, welded and bolted including special shaped washers etc. complete of Mild steel tubes, electric resistant or induction butt welded | 100 | 85.9171 | 8591.71 |
8 | (a) Flush pointing | 304 | 121.432302631579 | 36915.42 |
9 | b (i) Dense or hard soil for Road Work | 600 | 156.08125 | 93648.75 |
10 | (a) Dense or hard soil | 840 | 167.319095238095 | 140548.04 |
11 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 4175.75 | 4175.75 |