S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 15.63 | 58.4990403071017 | 914.34 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15)
(a) C.C. 1:2:4 (1cement, 2sand, 4metal) | 2 | 3920.695 | 7841.39 |
3 | (j) Cement mortar 1:6 (1cement, 6sand) | 0.8 | 3911.275 | 3129.02 |
4 | (d) Cement mortar 1:6 (1cement, 6sand) | 23 | 102.975217391304 | 2368.43 |
5 | (j) 5.0 Km. Lead | 3.13 | 174.610223642173 | 546.53 |
6 | (X) 5.0 Km. Lead | 9.38 | 195.158848614072 | 1830.59 |
7 | (X) 5.0 Km. Lead | 3.13 | 152.571884984026 | 477.55 |
8 | Providing and fixing on wall face unplasticised Rigid PVC Rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion.
(ii) 110 mm diameter (minimum wall thickness 2.2mm) | 15 | 232.200666666667 | 3483.01 |
9 | c (ii) Hard moorum for Well Work | 15.63 | 218.78310940499 | 3419.58 |
10 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 9.38 | 163.480810234542 | 1533.45 |
11 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 3.13 | 227.757188498403 | 712.88 |
12 | Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry. | 3.13 | 185.079872204473 | 579.3 |