State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: AITHAAR
Work Code: 1702001027/IF/9993698618 (Cattle Shed- Nathu ram / Satish Kumar)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 25/11/2015 Work start date : 21/12/2015
Present status : Not Exist Proposed Status : Cattle Shed
Tech Sanction Details
Technical Sanction No. : 1491/03 Sanction Date : 26/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Beneficiary Contribution scheme2 scheme3 Total
40000 50000 0 0 25000 0 0 75000 0 115000
Financial Sanction Details
Financial\Administrative Sanction No: 03/1491 Financial\Administrative Sanction Date 1/12/2015
Fin. Sanc. Amt. (in Rs) NREGA:90000 Beneficiary Contribution
25000
Scheme 2
0
Scheme 3
0
Total
115000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.8.607638.85498.1516
2Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.2.5958822288.79
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)2.6982414.76514.8606
4Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.10.17980.69972.702
5Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)4.6971901.18929.4667
6Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)11.0182982.132856.7778
7Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee.86.64494245.36
815mm thick cement plaster on rough side of wall in-Cement mortar 1:5 (1cement, 5sand)62.5899.46220.452
9Providing 6mm thick corrugated asbestos cement sheets roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm dia. G.I. plain and bitumen washer complete excluding the cost of purlines rafters and trusses.28.08385.510824.84
10Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-40 mm thick.26.6186.64963.56
11Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.11865218652
12Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil15.93996.21533.3318
13contingency125002500
Total Activity 115000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. B.T. METAL614008400
2AC seet28.083509828
3BRICK5500422000
4CEMENT (Beg)3828010640
5SAND5.8212006984
6STEEL86.64403465.6
7Stone cut Stone14.87419.756241.6825
8Transpotation Charges174007400
Total Material 75000