S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 24.3 | 53.3633744855967 | 1296.73 |
2 | (XIII) 8 Km. Lead | 24.3 | 236.318930041152 | 5742.55 |
3 | a (iii) Loose or soft soil for Tank Work | 13.5 | 92.0814814814815 | 1243.1 |
4 | b (iii) Dense or hard soil for Tank Work | 13.5 | 124.3 | 1678.05 |
5 | (b) Grading - 3 (Size ranging from 53 mm to 22.4 mm) | 1.35 | 676.192592592593 | 912.86 |
6 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 13.5 | 149.16 | 2013.66 |
7 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 9.45 | 208.028571428571 | 1965.87 |
8 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 3530.01 | 3530.01 |