Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 24-Jun-2024 06:31:56 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: BADGAON PIPLOD
Work Code: 1725007005/RC/25 (ग्रेवल मार्ग ईटवा गोनाखेडा मार्ग से काशीराम सीतारा)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2010-2011 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/1/2011 Work start date : 1/1/2011
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1213e Sanction Date : 12/1/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
304000 193000 0 0 0 0 0 193000 0 497000
Financial Sanction Details
Financial\Administrative Sanction No: 04e Financial\Administrative Sanction Date 13/1/2011
Fin. Sanc. Amt. (in Rs) NREGA:497000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
497000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.60002.816800
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil121555.667554
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum121566.981283.5
4Dag-beling-Single spade stroke minimum 75mm deep24000.2480
5Collection of approved soil having CBR not less then 12, including stacking at quarry.73881.460073.2
6Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 3168928512
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.195380.19156611.07
8Transportation rates for Hume pipes (NP-3) 800 mm to 900 mm dia.7.5446.813351.075
9Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN73844.132545.8
10Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.7.51930.914481.75
11work charge13530635306
Total Activity 497000
S.NoMaterialQuantityUnit PriceTotal
1Display board110001000
2Generator86004800
3HumePipes15250037500
4NP3 hume pipe dia 900mm000
5PhotoCopy & Stationary10220
6Photograph2025500
7Rolling Earth & moorum000
8Transportanion of hard Muram12156072900
9Transportation Of Material000
10Transportation Of Selected Soi7386044280
11WATER TENKAR8150012000
12रोलर10200020000
Total Material 193000