S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Work charge | 1 | 8000 | 8000 |
2 | Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like. | 162.57 | 47.5 | 7722.075 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 1.41 | 1867.7 | 2633.457 |
4 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 0.53 | 2611.8 | 1384.254 |
5 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand) | 75.96 | 1515.5 | 115117.38 |
6 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 185.76 | 55.2 | 10253.952 |
7 | Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size | 4.05 | 446.1 | 1806.705 |
8 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 10.8 | 77.3 | 834.84 |
9 | Collection of stone chips. quarry spalls or rubble (maximum size 0.004cum) Black trap, basalt or granite.-Other then black trap Basalt or granite | 4.05 | 77.3 | 313.065 |
10 | Transportation of metal | 1 | 41896 | 41896 |
11 | Labour only for boulder soling hand packed excluding consolidation. | 14.8 | 72.7 | 1075.96 |
12 | Earth work for well excavation including disposal of excavated soil lead upto 20 m. & lift upto 1.5 m., disposed soil to be levelled and neatly dressed. Loose or soft soil. Lift from 2.00 m. to 2.50 m. | 113.04 | 80.95 | 9150.588 |
13 | Earth work for well excavation including disposal of excavated soil lead upto 20 m. & lift upto 1.5 m., disposed to be levelled and neatly dressed. Loose or soft soil. Lift from 2.50 m. to 3.00 m. | 84.78 | 122.6 | 10394.028 |
14 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting) lift from 1.50 m. to 2.00 m. | 98.91 | 303.61 | 30030.0651 |
15 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 2.50 m. to 3.00 m. | 63.66 | 638.23 | 40629.7218 |