State: MADHYA PRADESH District: MANDSAUR Block: BHANPURA Panchayat: PARONYA
Work Code: 1716001028/RC/22012034208235 (Sudhur Khet Sampark Sadak Talab Ke Paas Se Sitaram)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2014 Work start date : 25/2/2014
Present status : No Road Proposed Status : Mitti Murram Road
Tech Sanction Details
Technical Sanction No. : 113/1028 Sanction Date : 5/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
730000 624000 0 0 0 0 0 624000 0 1354000
Financial Sanction Details
Financial\Administrative Sanction No: 05/1028 Financial\Administrative Sanction Date 15/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:1354000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1354000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard159345934
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.48004.119680
3Contingency150005000
4Work charge11234112341
5Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead92487.680942.4
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)10.453076.332147.335
7Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)59.52429.6144561.2
8Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used10.4580.7843.315
9False work for R.C.C. and P.C.C. work in plinth and foundation50.89171.68732.724
10TRANSPORTATION OF MATERIAL13000030000
11Chain and compass survey.-Canals/Roads0.8584467.2
12Fly levelling for fixing temporary bench marks.-Above 15 m interval0.8438350.4
13Levelling - Headwork.-Below 5 m interval0.814601168
14Levelling - Headwork.-Above 15 m interval0.8467.2373.76
15Stacking without boxing.-Puddle earth, moorum, sand or kankar92410.59702
16Transportation of metal 288132.2138076.48
17Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.288245.6170735.68
18Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.924108.99100706.76
19Loading of metal in truck, dumper etc.140426.236784.8
20Unloading of metal in truck, dumper etc.140412.1517058.6
21Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.14044157564
22Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia100313.231320
23Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia100860.986090
24Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia.153988.159821.5
25Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1025.8822.723287.476
26Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor2389.624.658784.16
27Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:192357.168563.2
28Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work3881.0481.2315140.448
29Collection of hard moorum including stacking at quarry.288130.837670.4
Total Activity 1354000
S.NoMaterialQuantityUnit PriceTotal
120 MM Metal10.455005225
240 mm metal(1.3.6)59.545026775
3cement bag27530082500
4Display board149344934
5pipe ac10031531500
6RCC NP3 Pipe 600mm10086086000
7RCC NP3 Pipe 900MM15400060000
8Rolling of Muram389529112955
9Rolling of Soil1025.8822.723287.476
10Transpotation Charges11500015000
11Transpotation of Mooram924190175560
Total Material 624000