State: PUNJAB District: AMRITSAR Block: TARSIKKA-7 Panchayat: BANIA
Work Code: 2602007007/IF/35287 (Bania sockpit 5)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/4/2020 Work start date : 25/5/2020
Present status : Existing Proposed Status : Construction of Soak Pit for Individual
Tech Sanction Details
Technical Sanction No. : 2602007/2020-2021/8694/TS Sanction Date : 21/5/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
958.62 8644.4 25.74 157.23 0 0 0 8900 0 9785.99
Financial Sanction Details
Financial\Administrative Sanction No: 2602007/2020-2021/8694/AS Financial\Administrative Sanction Date 21/5/2020
Fin. Sanc. Amt. (in Rs) NREGA:9786 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
9800
S.NoActivity taken upon musterollQuantityUnit PriceTotal
11:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)0.32757.9375242.54
2Cement concrete 1:2:4 with stone ballast or shingle0.053077153.85
3Supplying & Laying dry brick bats.2.12951.3490566037742016.86
4Cement Concrete 1:8:16 with 40 mm Gauge stone aggregate0.031707.3333333333351.22
5First class burnt brick laid in cement sand mortar 1:5 in foundation and plinth0.143453.78571428571483.53
612.5 mm thick cement plaster 1:4.0.26123.84615384615432.2
7Providing, Laying , fixing & jointing of P.V.C. Pipes as per ISI-4985 (ISI marked with the prior approval of Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specifications. (ii) 75mm o/d pipe of 10 Kgf. / sqcm9.15187.5661202185791716.23
8Earth work excavation in tank/digging work (Tank, Bandh, Pond/New Nalah, New Water Channel and construction of Retaining structure work).(1.1)Earth work excavation in Pond (Dugout, Pond, Mini Percolation Tank, compost Pit etc.) Ring Bandh (percolation Embankment, Earthen Gully plug, Water Harvesting Structure, Silt Distention Dam etc.)/pond/New Nalha/New Channal etc. Retuning wall-( wet or dry soil), laying 15 cm. layer-breaking of clods and emoving of Kankar and grass roots, dressing of earth work including compaction {with durmut) complete in all respect. (a) Ordinary Soil (i) 1.5 meter vertical lift and 15 meter horizontal lead3.91150.782608695652589.56
Total Activity 5300
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.022300
20012-Vibrator (Needle type 40 mm)0.022300
30295-Stone Aggregate(single size):20 mm nominal size0.213100
40297-Stone Aggregate(single size): 10 mm nominal size0.0700
50367-Portland Cement0.101800
60982-Coarse sand (zone III)0.141500
710-Miscellaneous /Contingencies charges135003500
82202-Stone aggregate below 40 mm nominal size0.28300
92203-Coarse sand0.141500
102209-Cement0.101800
113-Display Board110001000
129999-Sundries4.547400
13MR1606-cement0.6033260156.858
14MR1607-Course Sand0.0225570.2912.831525
15MR1608-Stone Aggregate 40mm gauge.0.028473.0213.24456
16MR1609-Stone Ballast (Bajri)0.045623.0428.0368
17MR1611-Bricks 1st class Including Carriage of 5km, Loading & Unloading.64.7365.03325.62208
18MR1613-Fine Sand0.0521662.8534.534485
19MR1614-Brick Ballast2.3309779.51816.93655
20MR1681-Semi Skilled Mazdoor Labour0.0256402.5510.30528
21MR1741-P.V.C pipes 75 mm o/d pipe of 10 Kgf. / sqcm9.6023163.561570.552188
Total Material 8500