S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.32 | 757.9375 | 242.54 |
2 | Cement concrete 1:2:4 with stone ballast or shingle | 0.05 | 3077 | 153.85 |
3 | Supplying & Laying dry brick bats. | 2.12 | 951.349056603774 | 2016.86 |
4 | Cement Concrete 1:8:16 with 40 mm Gauge stone aggregate | 0.03 | 1707.33333333333 | 51.22 |
5 | First class burnt brick laid in cement sand mortar 1:5 in foundation and plinth | 0.14 | 3453.78571428571 | 483.53 |
6 | 12.5 mm thick cement plaster 1:4. | 0.26 | 123.846153846154 | 32.2 |
7 | Providing, Laying , fixing & jointing of P.V.C. Pipes as per ISI-4985 (ISI marked with the prior approval of Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specifications. (ii) 75mm o/d pipe of 10 Kgf. / sqcm | 9.15 | 187.566120218579 | 1716.23 |
8 | Earth work excavation in tank/digging work (Tank, Bandh, Pond/New Nalah, New Water Channel and construction of Retaining structure work).(1.1)Earth work excavation in Pond (Dugout, Pond, Mini Percolation Tank, compost Pit etc.) Ring Bandh (percolation Embankment, Earthen Gully plug, Water Harvesting Structure, Silt Distention Dam etc.)/pond/New Nalha/New Channal etc. Retuning wall-( wet or dry soil), laying 15 cm. layer-breaking of clods and emoving of Kankar and grass roots, dressing
of earth work including compaction {with durmut) complete in all respect. (a) Ordinary Soil (i) 1.5 meter vertical lift and 15 meter horizontal lead | 3.91 | 150.782608695652 | 589.56 |