S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in open well excavation in hard soil or gravelly soil within all lead and lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per the direction of engineer-in-charge. | 200 | 5000 | 1000000 |