S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 2100 | 7.02398571428571 | 14750.37 |
2 | (I) Lead upto 100 Metres | 2756.25 | 38.8887256235828 | 107187.05 |
3 | (I) 1.50 m. to 3.00 m. | 5512.5 | 10.4835591836735 | 57790.62 |
4 | (c) C.C. 1:4:8 (1cement, 4sand, 8metal) | 6.3 | 2862.14285714286 | 18031.5 |
5 | (c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size) | 3.15 | 5348.12698412698 | 16846.6 |
6 | (e) In Cement mortar 1:6 (1cement, 6sand) | 28.35 | 2899.03209876543 | 82187.56 |
7 | (XXX) 60 Km. Lead | 77 | 9.76181818181818 | 751.66 |
8 | Benching the seat of embankment to an average depth of 15cm and cross slope of 1 in 12 including cleaning of all foreign material, vegetation and other growth like grass and plant roots and removing the rubbish up to a suitable distance and dressing etc. complete. | 393.75 | 172.890006349206 | 68075.44 |
9 | Site clearance, cutting grass, raking into heaps and removing off the premises | 2100 | 2.81891428571429 | 5919.72 |
10 | b (iii) Dense or hard soil for Tank Work | 5512.5 | 144.075000453515 | 794213.44 |
11 | (b) Dense or hard soil | 25.2 | 156.787301587302 | 3951.04 |
12 | 22cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum | 350 | 379.2054 | 132721.89 |