State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: JAWASA
Work Code: 1702001018/WC/22012035006952 (dag pond- genda lal ke tor ke pass madiya )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 16/8/2022 Work start date : 15/10/2022
Present status : Non-existent Proposed Status : Construction of Mini Percolation Tank for Comm
Tech Sanction Details
Technical Sanction No. : 1702001/2022-2023/168733/TS Sanction Date : 1/11/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
1001612.99 259245.92 33321.25 11249.97 0 0 0 304000 0 1305430.13
Financial Sanction Details
Financial\Administrative Sanction No: 1702001/2022-2023/168733/AS Financial\Administrative Sanction Date 2/11/2022
Fin. Sanc. Amt. (in Rs) NREGA:1305430 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1306000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.21007.0239857142857114750.37
2(I) Lead upto 100 Metres2756.2538.8887256235828107187.05
3(I) 1.50 m. to 3.00 m.5512.510.483559183673557790.62
4(c) C.C. 1:4:8 (1cement, 4sand, 8metal)6.32862.1428571428618031.5
5(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)3.155348.1269841269816846.6
6(e) In Cement mortar 1:6 (1cement, 6sand)28.352899.0320987654382187.56
7(XXX) 60 Km. Lead779.76181818181818751.66
8Benching the seat of embankment to an average depth of 15cm and cross slope of 1 in 12 including cleaning of all foreign material, vegetation and other growth like grass and plant roots and removing the rubbish up to a suitable distance and dressing etc. complete.393.75172.89000634920668075.44
9Site clearance, cutting grass, raking into heaps and removing off the premises21002.818914285714295919.72
10b (iii) Dense or hard soil for Tank Work5512.5144.075000453515794213.44
11(b) Dense or hard soil25.2156.7873015873023951.04
1222cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum350379.2054132721.89
Total Activity 1303000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper1.68218851488.6585
20084-Hire charges of Diesel truck - 9 tonne (without POL)0.133022282242298.23595176
30297-Stone Aggregate(single size): 10 mm nominal size0.693630436.59
40367-Portland Cement4.7141325551125979.5842075
50982-Coarse sand (zone III)4.22682751028.164345.8549624
60983-Fine sand (zone IV)11.4278851076.2512299.26123125
71157-Stone for masonry work32.886519.7517092.4985
81158-Stone for pitching 15 cm x 22.5 cm10531533075
91235-Diesel oil3.6219137868246.29013704
103-Display Board / CIB130003000
115001-Mobil oil0.12968748182.923.719840092
12MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT5.84561255253068.9465625
13MR6007-Hier Charges for Centering3.158002520
14MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)4.268886822911.37616
Total Material 107000