Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:01:09 AM 
Back  
State: PUNJAB District: BARNALA Block: Sehna Panchayat: KHADAK SINGH WALA
Work Code: 2621009046/WH/9989019029 (Renovation of pond at village Khark singh wala 22-23)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 8/4/2022 Work start date : 19/4/2022
Present status : Derelict Proposed Status : Renovation of Fisheries Ponds for Community
Tech Sanction Details
Technical Sanction No. : 2621009/2022-2023/2665/TS Sanction Date : 22/4/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
883753.86 90956.58 7186.56 0 0 0 0 98200 0 981897
Financial Sanction Details
Financial\Administrative Sanction No: 2621009/2022-2023/2665/AS Financial\Administrative Sanction Date 16/6/2022
Fin. Sanc. Amt. (in Rs) NREGA:981897 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
982000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Running and maintenance of pumping set 8 H.P./ Generator set for dewatering arrangements complete in all respects.(Note :- (i)The Engine with pumping set of 8 H.P. will run 4 bores. (ii) The generator set having engine of 8 H.P. coupled with alternator of 5 H.P. will run motor of 4 H.P.)130248.50723076923132305.94
2Earth work excavation in tank/digging work (Tank, Bandh, Pond/New Nalah, New Water Channel and construction of Retaining structure work).(1.1)Earth work excavation in Pond (Dugout, Pond, Mini Percolation Tank, compost Pit etc.) Ring Bandh (percolation Embankment, Earthen Gully plug, Water Harvesting Structure, Silt Distention Dam etc.)/pond/New Nalha/New Channal etc. Retuning wall-( wet or dry soil), laying 15 cm. layer-breaking of clods and emoving of Kankar and grass roots, dressing of earth work including compaction {with durmut) complete in all respect. (a) Ordinary Soil (ii) 1.5meter vertical lift and 30meter horizontal lead5144.265184.008982818731946590.97
Total Activity 979000
S.NoMaterialQuantityUnit PriceTotal
13-Display Board130003000
2MR1710-Capital cost of 8 H.P. Diesel Engine/ generator set with pumping set including accessories.( 2400 hours = 37800) for 1 hr. = 15.7513024.583195.4
3MR1711-Depreciation charges as per CWC guide book @ 10% i.e. on Rs. 24.581302.46319.8
4MR1712-Diesel228.87517160
5MR1713-Repair provision 10% of 5.90 of per hr.1305.9767
6MR1723-Repair of 8 H.P Diesel Engine.1305.9767
Total Material 25300