Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 06:45:47 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: KHADAUA(P)
Work Code: 1703004016/RS/22012034396276 (Nali Nirman Suresh Ke makan se Yashwant singh ki or)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2017 Work start date : 31/1/2018
Present status : Not Exist Proposed Status : Drainage Channel
Tech Sanction Details
Technical Sanction No. : 16/494 Sanction Date : 16/1/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
548000 684000 0 0 0 0 0 684000 0 1232000
Financial Sanction Details
Financial\Administrative Sanction No: 016/016 Financial\Administrative Sanction Date 26/1/2018
Fin. Sanc. Amt. (in Rs) NREGA:1232000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1232000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.68.888260681.6
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)68.82202.3151518.24
3Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used25.83307.485330.92
4Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.290.252022.7587088.675
520mm thick cement plaster in two coat on rough side of wall in-Cement mortar 1:5 (1cement, 5sand)68878.554008
6Transportation of metal 63.3183.711628.21
7Transportation of metal 21.93451.79905.781
8Transportation of sand166.23196.8332719.0509
9Transportation rates for Masonry stone.290.25453.18131535.495
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.33.83165.335593.1139
11Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil68896.266185.6
12contingency135805.314235805.3142
Total Activity 1232000
S.NoMaterialQuantityUnit PriceTotal
120mm metal21.93150032895
240 MM Metal supply63.3130082290
3Cement950300285000
4Contengency1572.505572.505
5Display board1500500
6Khanda Praday290.25453.18131535.495
7SANT166.23900149607
8Transpotation Charges2200400
9WATER CHANNEL1800800
10गिट्रटी परिवहन2200400
Total Material 684000