Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:41:48 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: GUDIKHEDA RAIYAT
Work Code: 1725007032/RC/721 (पंचपरमेश्‍वरसीसीरोड सहनाली निर्माण जैन मंदिर से सं)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 11/9/2012 Work start date : 30/9/2012
Present status : Cement concrete Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 447a Sanction Date : 11/10/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
123600 82400 0 0 360000 0 0 443000 0 566000
Financial Sanction Details
Financial\Administrative Sanction No: 11736 Financial\Administrative Sanction Date 3/12/2012
Fin. Sanc. Amt. (in Rs) NREGA:206000 Panchparmeshwar
360000
Scheme 2
0
Scheme 3
0
Total
566000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil186.4173.413682.494
2Dag-beling-Double spade "v" shaped stroke 100mm deep6450.4258
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)131.443002.1394596.024
4Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used131.44108.714287.528
5False work for R.C.C. and P.C.C. work in plinth and foundation248.7147.436658.38
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)756.1457.5
7Collection of approved soil having CBR not less then 12, including stacking at quarry.138.16107.414838.384
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 138.166.5898.04
9Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 131.4436.54797.56
10Transportation of metal 111.7224227036.24
11Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.223.6133.729895.32
12Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7138.1621.32942.808
13work charge12500025000
Total Activity 566000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT(BEGS)800300240000
2Centring & Shuttering303009000
3Display board120002000
4Empty Gunny Bag70042800
5mason perday183005400
6mixer machin (perday)1870012600
7murrom4630013800
8PhotoCopy & Stationary2502500
9photographs405200
10POLYTHENE (CUM)130003000
11SAND5060030000
12TESTING CHARG120002000
13Thermocoal120002000
14Vibrator (Per Day)184007200
15गिटटी 20 mm10490093600
16पानी टेकर4540018000
Total Material 443000